1
 
Site-1 Riyadh Pipeline Project
 Location: Riyadh
 From:  1995
 To:  1999
 Description :

Procure, construct and pre-commission twin 18 km. 10” Ø pipelines to connect the existing Riyadh Refinery to the new product storage caverns. 
Fibre Optic length approximately 45 km.
The project scope included civil, structural, mechanical, tank erection, cathodic protection, fire protection, electrical and instrumentation work related to the following:

Riyadh Refinery

  • Custody metering and proving skids
  • Shipping and Multi-Product Transfer pumps
  • Scraper trap facilities
  • Pump manifold and pipe tie-ins to existing facilities

Product Storage Caverns

  • Back pressure  valve station
  • Surge relief system
  • Custody metering and proving skids
  • Pump manifolds and pipe tie-ins to product storage tanks
  • Low flash and high flash interface tanks
  • Scraper trap facilities
  • Product transfer pump station
  • Underground services, including firewater mains

All electrical associated works

Site-5 Jeddah Pipeline Project
 Location: Jeddah
 From:  December 1996
 To:  2001
 Description :

Procure, construct and pre-commission a 100 km. 12” Ø Below Ground pipeline to connect the existing Jeddah Refinery, the North Jeddah Bulk Plant and the new product storage caverns. 
Below Ground Fibre Optic length approximately 100 km.
The project scope included civil, structural, mechanical, tank erection, cathodic protection, fire protection, electrical and instrumentation work related to the following:

Jeddah Refinery

  • Custody metering and proving skids 
  • Shipping and Multi-Product Transfer pumps
  • Scraper trap facilities
  • Pump manifold and pipe tie-ins to existing facilities
  • Underground services including extension of firewater mains
  • 33KV & 13.8 KV Switchgear buildings and transformer stations

North Jeddah Bulk Plant/Receiving Station

  • Surge relief system
  • Custody metering and proving skids
  • Pump manifolds and pipe tie-ins to product storage tanks
  • Low flash and high flash interface tanks
  • Scraper trap facilities
  • Product transfer pump station

Underground services, including firewater mains

Site - 6 Jizan/Abha Pipeline Project
 Location: Abha and Jizan
 From:  March 16, 1997
 To:  February 04, 2004
 Description :

Procure; construct and pre-commission a 250 km. below ground 14” Ø pipeline to connect the existing Jizan Bulk Plant to a new Bulk Plant to be erected by others in Abha.  Due to the elevation changes over the pipeline route over 2000 meters, Booster Pump stations were also provided at pipeline km. 153 & 185.  Electrical works, communication and air conditioning works.
Below Ground Fibre Optic length approximately 263 kilometres was also constructed along the same route.  Elevations ranging from 0 meter to over 2000 meters.

  • 12 – Fibre, Single Mode – Pipeline
  • 14 – Valve stations with solar systems
  • 24 – Fibre, Single Mode – Valve Station Entry

The project scope includes civil, structural, mechanical, tank erection, cathodic protection, fire protection, electrical and instrumentation work related to the following:

Jizan Bulk Plant

  • Custody metering and proving skids             
  • Shipping and Multi-Product Transfer pumps
  • Scraper trap facilities
  • Pump manifold and pipe tie-ins to existing facilities and all associated electrical works

Booster Pump Stations 1 & 2

  • Substation and crew building
  • Booster and Diesel Storage transfer & Firewater Tanks
  • Diesel powered generators
  • Firewater system, including pumps
  • Surge relief system
  • Scraper trap facilities
  • Pump manifolds and bypasses
  • All electrical works and with air conditioning

Abha Bulk Plant/Receiving Station

  • Pressure reducing valve station and surge relief system
  • Custody metering and proving skids
  • Pump manifolds and pipe tie-ins to product storage tanks
  • Low flash and high flash interface tanks
  • Scraper trap facilities
  • Product transfer pump station
  • Underground services, including firewater mains

Electrical and Air Conditioning works

Site – 7 Madinah to Yanbu Pipeline Project
 Location: Madinah & Yanbu
 From:  June 04, 2002
 To:  December 2005
 Description :

Procure, construct and pre-commission a 157 km. 14” Ø Below Ground pipeline to connect the existing Yanbu Refinery to the existing Madinah Bulk Plant. This pipeline encompassed laying of over 3 km within tunnels.
Burried Fibre Optic Cable length approximately 157 km.
The project scope includes civil, structural, mechanical, tank erection, cathodic protection, Fire protection, electrical, air conditioned works and instrumentation works related to the following and over 200 gabions placed in WADIS for flood protection.

Yanbu Refinery

  • Custody metering and proving skids
  • Shipping and Multi-Product Transfer pumps
  • Scraper trap facilities
  • Pump manifold and pipe tie-ins to existing facilities
  • Underground services including on oily water Lift Station, firewater and electrical.

Madinah Bulk Plant/Receiving Station

  • Back pressure valve station and Surge relief system
  • Custody metering and proving skids
  • Pump manifolds and pipe tie-ins to product storage tanks
  • Low flash and high flash interface tanks
  • Scraper trap facilities
  • Product transfer pump station and interface truck loading pumps
  • Underground services, including firewater mains

Booster Pump Stations 1 & 2

  • Substation and crew building
  • Booster and Diesel Storage transfer & Firewater Tanks
  • Diesel powered generators
  • Firewater system, including pumps
  • Surge relief system
  • Scraper trap facilities
  • Pump manifolds and bypasses
  • Emergency Shutdown System
Site – 3 Buraidah Pipeline Plant Project
 Location: Buraidah
 From:  November 23, 2003
 To:  December 16, 2007
 Description :

Procure, construct, and pre-commission a 75 of twin km. 12” Ø Below Ground pipeline and have concrete encased Fibre Optic Cable to connect the existing Qassim Bulk Plant to Buraidah Bulk Plant. 

 Qassim Supply Pump Station

  • Back pressure valve station and Surge relief system
  • Custody metering and proving skids
  • Pump manifolds and pipe tie-ins to product storage tanks
  • Low flash and high flash interface tanks
  • Scraper trap facilities
  • Product transfer pump station and interface truck loading pumps
  • Underground services, including firewater mains
  • Emergency Shutdown System

The project scope includes civil, structural, mechanical, cathodic protection, fire protection, electrical, communication,  instrumentation works and commissioning support  related to the following:

  • Scraper trap facilities
  • Valve Stations

Cathodic Protection including pipeline, Tank farm, Fire water equipments etc.
Instrumentation like plant instruments (pressure instruments, flow instruments, pneumatic instruments, etc.
Solar Power System including solar batteries and accessories instruments

© 2011-2017 Metals Services For Trading & Contracting Co. All rights reserved.