1
 
Installation of Crude Oil Pipeline
 Location: Hofuf, Saudi Arabia
 From:  April 2008
 To:  June 2009
 Description :

This scope of work details the work required to install Pipeline of about 34,000 meters long pipe of 8” Ø ERW pipe with external FBE coating, about 1500 meters long SMLS pipe of 8” Ø without coating, and about 400 meters long SMLS pipe of 8” Ø with external FBE coating for transferring 20500 barrels per day crude oil from Saudi Aramco, Abqaiq Plant to Saudi Cement Hofuf Plant.

Scope of work also includes the installation of the following:

  • Custody Metering Skid
  • Ultrasonic Flow Meter
  • Scraper Traps
  • Leak Detection System
  • All associated electrical works