Home  |  Contact Us  |  E-Mail
 
PROJECTS LIST
  Ongoing Projects
  Completed Projects
 
Ma’aden Gold and Base Metals Company Ongoing Projects
1
 
EPC Transportation of Treated Water from Taif to Ma’aden Mine Site
 Location: Taif to Riyadh
 From:  November 12, 2011
 To:  February 15, 2014
 Description :

Scope of work is divided into three sections as follows:

EPC Package 1:      

Transport Pump Station (TPS) and 71KM Pipeline up to Mater Pump Station which shall consist of Transfer Pump Station inclusive of all facilities with fence and Operation building, SEC room, Interconnecting Piping and fittings, Transfer Pumps, 71KM Pipeline installation up to nozzle of Water Storage Tanks at MPS, Pressure Reducing Valve, Relief Valves, Gear Operated Valves and associated WORK’s related to Electrical, Instrumentation and Communication equipment’s.  EPC-1 shall conduct hydraulic analysis for the 71KM segment.

EPC Package 2:      

Master Pump Station (MPC) and 233 KM Pipeline up to KM304 marker which shall consist of Master Pump Station inclusive of all facilities with fence, Office Building and Pump House Building, Guard house, SEC room, Interconnecting Piping and fittings, 233KM Pipeline installation from KM71 to KM304 Marker, valves and associated WORK’s related to Electrical, Instrumentation and Communication equipment’s. EPC-2 shall conduct Hydraulic analysis for 349KM from MPS to Ad-Duaihi.

EPC Package 3:      

Ad-Duaihi Storage Facility and 116KMS Pipeline up to Ad-Duaihi which shall consist of Ad-Duaihi Storage Facility inclusive of all facilities with fence, Generator Room, Pump Shelter and Operation Building, Guard House, Interconnecting Piping and fittings, 116KM Pipeline and FOC installation from KM304 to Ad-Duaihi, Pressure Reducing Valve Station, Relief Valves, Gear Operated valves and associated WORK’s related to Electrical, Instrumentation and Communication equipment’s

© 2011-2017 Metals Services For Trading & Contracting Co. All rights reserved.
Designed By: SAUDI SOFTECH (MSTT)